The construction site of the new clinic as it currently stands. We’ve spent the last couple of weeks jackhammering out the cracked floors in preparation to pour new, uncracked floors. We’ve also been digging footings for the half-walls flanking the walkways and supporting the roof structure. With all of the rain we’ve been having, it’s basically like trenching through modeling clay. We’re hoping for a few dry days so that we can bail the trenches out (the water is seeping right back into the trenches after the rain) and pour the footings in the coming weeks.